13 06 2023
Site Setup
04 07 2024
Buildings repaired


08 07 2024
Footings reinforcement
16 08 2024
Site clearance


04 12 2024
6 inch drainage installed
21 03 2025
1st floor external timber frame infill complete


26 03 2025
A view from the rear garden
25 04 2025
Exterior wall insulation complete


02 06 2025
Roof water tight
20 06 2025
1st floor studwall complete


20 06 2025
Greencoat roof complete
20 06 2025
Front boundary wall foundation poured


09 07 2025
Site Hoarding Complete
09 07 2025
Site Hoarding Complete


09 07 2025
Visit from Telford Cylinders
09 07 2025
Loft wall boarding complete


07 08 2025
Temp Flooring removed, acoustic neoprene rubber strips installed on joists
13 08 2025
Metal floating floors installed on joists


20 08 2025
Underfloor Heating pipes installed on metal floor
25 08 2025
Actis space quilt installation completion for internal wall insulation


28 08 2025
Underfloor Heating pipes installed on metal floor, pre screed work completed
15 09 2025
C30 concrete screed poured to all metal floors


13 11 2025
Rockwool wall and ceiling insulation install to all internal ceilings and walls
13 11 2025
Rockwool wall and ceiling insulation install to all internal ceilings and walls


13 11 2025
Rockwool wall and ceiling insulation install to all internal ceilings and walls
20 11 2025
Rockwool wall and ceiling insulation install to all internal ceilings and walls


26 03 2026
Front courtyard water attenuation tank dug out
26 03 2026
Front courtyard water attenuation tank installed


02 04 2026
Front courtyard water management system installed and backfilled